The CIP/Gas Management takes place without power supply via a switch module or with power supply via a shuttle valve or a modulating control valve with butterfly valve or a butterfly valve combination.
Automatic switch module (without power supply)
Path I: open
Path II: open
In idle position of the tank, the switch module keeps the path for tank gassing and degassing open. The path to the cleaning device is always opened.
During CIP supply to the cleaning lance the switch module is switching automatically as of 10 m3/h. The rotating jet cleaner is an exception: The switch module closes here at 8 m3/h. With the closing of the switch module the path for tank gassing and degassing is closed.
Please note for dimensioning! The pressure dependent gas pipe is designed for a flow rate of max. 92m3/h CO2 at an operating pressure of 2 bar g. This is convertible to other process parameters. The switch module is self-cleaning.
Butterfly valve combination (with power supply)
Path I : closed
Path II: opened
In idle position of the tank, the switch module keeps the path for tank gassing and degassing open. The path to the cleaning device is closed. Pneumatic path switching is provided. The path to the cleaning device is then opened and the gassing/ degassing path closed. The switch module is designed for higher gas rates.
Butterfly valve combination with P-15 (with power supply)
Path I : closed
Path II: opened
The switch module regulates gassing and degassing according to the operating and process parameters via path II. This is a compact way to control the pressure during the fermentation process.
The control valve is designed as T-smart 7 butterfly valve in combination with a T.VIS® P-15 is provided in the path II. Path I is closed by a T-smart butterfly valve in combination with a T.VIS® M-15 then.